Malynivka: 1,140 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,142). #80 of 430 in the rayon, #1004 of 1856 in the oblast.

Myrhorod, the rayon centre, is 10 km away. 139 m above sea level. 10 km away: Myrhorod, the nearest bigger centre, 1,133 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Полтава, 89 km. 12.10 m between rows, pitch 15.92 m (latitude 50.0°).

Yield of 1 kWp
1,140kWh/year
Tilt
37°1° east of south
10 kW
11,404kWh/year
Row pitch
15.92m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Malynivka

The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 89 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan55Feb93Mar119Apr140May144Jun147Jul146Aug115Sep83Oct37Nov25Dec

July: 147 kWh/kWp, December: 25 — 5.9 times less.

November: 37 against 39 in the oblast, 5.1% less.

Malynivka: plants, kWh
kWpA yearJulyDecember
55,702735125
1011,4041,470250
1517,1062,205375

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.