Solar plant: site data

Solar power plant in Hovory, Myrhorodskyi Raion, Poltava Oblast

Hovory: 1,151 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.8% above the oblast median (1,142). #8 of 430 in the rayon, #507 of 1856 in the oblast.

Myrhorod, the rayon centre, is 45 km away. 128 m above sea level. 26 km away: Velyka Bahachka, the nearest bigger centre, 1,144 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Полтава, 64 km. 11.69 m between rows, pitch 15.51 m (latitude 49.6°).

Yield of 1 kWp
1,151kWh/year
Tilt
37°2° east of south
10 kW
11,506kWh/year
Row pitch
15.51m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Hovory

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 64 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan56Feb95Mar118Apr139May143Jun147Jul146Aug118Sep86Oct40Nov27Dec

July: 147 kWh/kWp, December: 27 — 5.4 times less.

December: 27 against 25 in the oblast, 8.0% more.

Hovory: plants, kWh
kWpA yearJulyDecember
55,753735135
1011,5061,470270
1517,2592,205405

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.