Solar plant: site data
Solar power plant in Andrushchyne, Myrhorodskyi Raion, Poltava Oblast
Andrushchyne: 1,159 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.5% above the oblast median (1,142). #1 of 430 in the rayon, #273 of 1856 in the oblast.
Myrhorod, the rayon centre, is 46 km away. 125 m above sea level. 28 km away: Velyka Bahachka, the nearest bigger centre, 1,144 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Полтава, 63 km. 11.68 m between rows, pitch 15.50 m (latitude 49.5°).
- Yield of 1 kWp
- 1,159kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,587kWh/year
- Row pitch
- 15.50m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,450 / 470Pa
Ground frame designer
A ground frame for a solar plant: Andrushchyne
The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 63 km: snow 1,450 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 148 kWh/kWp, December: 28 — 5.3 times less.
December: 28 against 25 in the oblast, 12.0% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,794 | 740 | 140 |
| 10 | 11,587 | 1,480 | 280 |
| 15 | 17,381 | 2,220 | 420 |
Example: a 10 kW ground frame
For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Hovory2 km1,151 kWh/kWp
- Kravchenky2 km1,158 kWh/kWp
- Malynshchyna2 km1,155 kWh/kWp
- Olefiry4 km1,158 kWh/kWp
- Bondusi5 km1,151 kWh/kWp
- Rokyta5 km1,148 kWh/kWp
All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.