Solar plant: site data

Solar power plant in Bilotserkivtsi, Lubenskyi Raion, Poltava Oblast

Bilotserkivtsi: 1,133 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.8% below the oblast median (1,142). #176 of 346 in the rayon, #1395 of 1856 in the oblast.

Lubny, the rayon centre, is 40 km away. 126 m above sea level. 38 km away: Pryluky, the nearest bigger centre, 1,116 — 1.5% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 110 km. 12.41 m between rows, pitch 16.23 m (latitude 50.3°).

Yield of 1 kWp
1,133kWh/year
Tilt
37°2° east of south
10 kW
11,327kWh/year
Row pitch
16.23m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Bilotserkivtsi

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 110 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan59Feb96Mar119Apr139May142Jun146Jul142Aug113Sep81Oct36Nov24Dec

July: 146 kWh/kWp, December: 24 — 6.1 times less.

November: 36 against 39 in the oblast, 7.7% less.

Bilotserkivtsi: plants, kWh
kWpA yearJulyDecember
55,664730120
1011,3271,460240
1516,9912,190360

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.