Solar plant: site data
Solar power plant in Mudre, Prylutskyi Raion, Chernihiv Oblast
Mudre: 1,121 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 1.2% above the oblast median (1,108). #100 of 285 in the rayon, #217 of 1558 in the oblast.
Pryluky, the rayon centre, is 37 km away. 144 m above sea level. 37 km away: Pryluky, the nearest bigger centre, the same 1,116. Snow and wind from the nearest regional centre in the DBN — Черкаси, 113 km. 12.43 m between rows, pitch 16.25 m (latitude 50.4°).
- Yield of 1 kWp
- 1,121kWh/year
- Tilt
- 37°3° east of south
- 10 kW
- 11,214kWh/year
- Row pitch
- 16.25m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Mudre
The designer opens with this place’s coordinates, latitude 50.4° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 113 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 146 kWh/kWp, December: 23 — 6.3 times less.
October: 80 against 75 in the oblast, 6.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,607 | 730 | 115 |
| 10 | 11,214 | 1,460 | 230 |
| 15 | 16,821 | 2,190 | 345 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.
How these numbers are computed
Nearby
- Dashchenky3 km1,130 kWh/kWp
- Bilotserkivtsi3 km1,133 kWh/kWp
- Yashchenkiv6 km1,125 kWh/kWp
- Yatsyny7 km1,138 kWh/kWp
- Sukha Lokhvytsia7 km1,135 kWh/kWp
- Ostapivka8 km1,121 kWh/kWp
All places: Prylutskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.