Poland: solar plant site data

Solar power plant in Tczew, Poland: yield, tilt angle and row spacing

Tczew: 1,059 kWh per kWp a year at the optimal tilt of 41°, 2° east of south (PVGIS). 0.6% below the median of the main cities of Poland (1,065). #56 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 5.0% less here.

Tczew is in Pomeranian Voivodeship. Population 60,133 (GeoNames). 29 m above sea level. 30 km away: Gdansk, the nearest bigger city, 1,067 kWh/kWp — 0.8% less here. 19.14 m between rows, pitch 22.75 m, GCR 0.21 (latitude 54.1°).

Yield of 1 kWp
1,059kWh/year
Tilt
41°2° east of south
10 kW
10,588kWh/year
Row pitch
22.75m · GCR 0.21
Rank in the country
56of 87 cities

Ground frame designer

A ground frame for a solar plant: Tczew

Latitude 54.1°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

26Jan49Feb93Mar127Apr138May136Jun129Jul123Aug107Sep74Oct32Nov24Dec

May: 138 kWh/kWp, December: 24 — 5.8 times less.

January: 26 against the median of 37 for the main cities of Poland, 29.7% less.

Tczew: plants, kWh
kWpA yearMayDecember
55,294690120
1010,5881,380240
1515,8822,070360

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.