Poland: solar plant site data

Solar power plant in Gdynia, Poland: yield, tilt angle and row spacing

Gdynia: 1,026 kWh per kWp a year at the optimal tilt of 41°, 3° east of south (PVGIS). 3.6% below the median of the main cities of Poland (1,065). #78 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 7.9% less here.

Gdynia is in Pomeranian Voivodeship. Population 257,000 (GeoNames). 14 m above sea level. 20 km away: Gdansk, the nearest bigger city, 1,067 kWh/kWp — 3.8% less here. 20.08 m between rows, pitch 23.69 m, GCR 0.20 (latitude 54.5°).

Yield of 1 kWp
1,026kWh/year
Tilt
41°3° east of south
10 kW
10,262kWh/year
Row pitch
23.69m · GCR 0.20
Rank in the country
78of 87 cities

Ground frame designer

A ground frame for a solar plant: Gdynia

Latitude 54.5°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan47Feb89Mar125Apr135May135Jun127Jul119Aug100Sep66Oct30Nov24Dec

May: 135 kWh/kWp, December: 24 — 5.6 times less.

November: 30 against the median of 41 for the main cities of Poland, 26.8% less.

Gdynia: plants, kWh
kWpA yearMayDecember
55,131675120
1010,2621,350240
1515,3932,025360

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Poland: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.