Solar power plant in Kalisz, Poland: yield, tilt angle and row spacing
Kalisz: 1,085 kWh per kWp a year at the optimal tilt of 40°, 3° east of south (PVGIS). 1.9% above the median of the main cities of Poland (1,065). #15 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 2.6% less here.
Kalisz is in Greater Poland Voivodeship. Population 108,759 (GeoNames). 109 m above sea level. 95 km away: Lodz, the nearest bigger city, 1,062 kWh/kWp — 2.2% more here. 14.93 m between rows, pitch 18.59 m, GCR 0.26 (latitude 51.8°).
- Yield of 1 kWp
- 1,085kWh/year
- Tilt
- 40°3° east of south
- 10 kW
- 10,854kWh/year
- Row pitch
- 18.59m · GCR 0.26
- Rank in the country
- 15of 87 cities
Ground frame designer
A ground frame for a solar plant: Kalisz
Latitude 51.8°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
May: 133 kWh/kWp, December: 31 — 4.3 times less.
September: 109 against the median of 105 for the main cities of Poland, 3.8% more.
| kWp | A year | May | December |
|---|---|---|---|
| 5 | 5,427 | 665 | 155 |
| 10 | 10,854 | 1,330 | 310 |
| 15 | 16,281 | 1,995 | 465 |
Snow and wind loads
Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: PN-EN 1991-1-3 + NA, PN-EN 1991-1-4 + NA
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.