Solar plant: site data
Solar power plant in Pryvitne, Bilhorod-Dnistrovskyi Raion, Odesa Oblast
Pryvitne: 1,310 kWh per kWp a year, tilt 36° facing south (PVGIS). 7.3% above the oblast median (1,221). #26 of 134 in the rayon, #39 of 1177 in the oblast.
Bilhorod-Dnistrovskyi, the rayon centre, is 13 km away. 43 m above sea level. 13 km away: Bilhorod-Dnistrovskyi, the nearest bigger centre, 1,288 — 1.7% more here. Snow and wind from the nearest regional centre in the DBN — Одеса, 55 km. 9.02 m between rows, pitch 12.89 m (latitude 46.1°).
- Yield of 1 kWp
- 1,310kWh/year
- Tilt
- 36°facing south
- 10 kW
- 13,098kWh/year
- Row pitch
- 12.89m · GCR 0.37
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 880 / 460Pa
Ground frame designer
A ground frame for a solar plant: Pryvitne
The designer opens with this place’s coordinates, latitude 46.1° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 55 km: snow 880 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 157 kWh/kWp, December: 45 — 3.5 times less.
December: 45 against 38 in the oblast, 18.4% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,549 | 785 | 225 |
| 10 | 13,098 | 1,570 | 450 |
| 15 | 19,647 | 2,355 | 675 |
Example: a 10 kW ground frame
For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Abrykosove3 km1,307 kWh/kWp
- Sofiivka4 km1,315 kWh/kWp
- Cherkesy6 km1,302 kWh/kWp
- Vyhon6 km1,309 kWh/kWp
- Polove7 km1,301 kWh/kWp
- Bilenke8 km1,304 kWh/kWp
All places: Bilhorod-Dnistrovskyi RaionOdesa Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.