Solar power plant in Nyzhniy Kuyalnyk, Berezivskyi Raion, Odesa Oblast

Nyzhniy Kuyalnyk: 1,242 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.7% above the oblast median (1,221). #4 of 229 in the rayon, #398 of 1177 in the oblast.

Berezivka, the rayon centre, is 45 km away. 14 m above sea level. 32 km away: Dobroslav, the nearest bigger centre, the same 1,243. Snow and wind from the nearest regional centre in the DBN — Одеса, 48 km. 9.49 m between rows, pitch 13.36 m (latitude 46.9°).

Yield of 1 kWp
1,242kWh/year
Tilt
36°2° east of south
10 kW
12,415kWh/year
Row pitch
13.36m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Nyzhniy Kuyalnyk

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 48 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan61Feb107Mar127Apr142May143Jun152Jul151Aug126Sep100Oct53Nov38Dec

July: 152 kWh/kWp, December: 38 — 4.0 times less.

February: 61 against 58 in the oblast, 5.2% more.

Nyzhniy Kuyalnyk: plants, kWh
kWpA yearJulyDecember
56,208760190
1012,4151,520380
1518,6232,280570

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berezivskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources