Solar plant: site data

Solar power plant in Novoselivka, Bilhorod-Dnistrovskyi Raion, Odesa Oblast

Novoselivka: 1,275 kWh per kWp a year, tilt 37° 4° east of south (PVGIS). 4.5% above the oblast median (1,221). #81 of 134 in the rayon, #201 of 1177 in the oblast.

Bilhorod-Dnistrovskyi, the rayon centre, is 61 km away. 14 m above sea level. 61 km away: Bilhorod-Dnistrovskyi, the nearest bigger centre, 1,288 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Одеса, 101 km. 9.19 m between rows, pitch 13.01 m (latitude 46.0°).

Yield of 1 kWp
1,275kWh/year
Tilt
37°4° east of south
10 kW
12,753kWh/year
Row pitch
13.01m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Novoselivka

The designer opens with this place’s coordinates, latitude 46.0° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 101 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan66Feb111Mar128Apr144May141Jun149Jul151Aug129Sep103Oct59Nov47Dec

August: 151 kWh/kWp, January: 47 — 3.2 times less.

December: 47 against 38 in the oblast, 23.7% more.

Novoselivka: plants, kWh
kWpA yearAugustJanuary
56,377755235
1012,7531,510470
1519,1302,265705

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilhorod-Dnistrovskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.