Myrnopillia: 1,256 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.9% above the oblast median (1,221). #41 of 99 in the rayon, #307 of 1177 in the oblast.

Bolhrad, the rayon centre, is 73 km away. 36 m above sea level. 69 km away: Kiliya, the nearest bigger centre, 1,311 — 4.2% less here. Snow and wind from the nearest regional centre in the DBN — Одеса, 113 km. 9.01 m between rows, pitch 12.88 m (latitude 46.1°).

Yield of 1 kWp
1,256kWh/year
Tilt
36°3° east of south
10 kW
12,557kWh/year
Row pitch
12.88m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Myrnopillia

The designer opens with this place’s coordinates, latitude 46.1° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 113 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan64Feb109Mar127Apr142May140Jun148Jul148Aug127Sep102Oct58Nov45Dec

July: 148 kWh/kWp, January: 45 — 3.3 times less.

December: 45 against 38 in the oblast, 18.4% more.

Myrnopillia: plants, kWh
kWpA yearJulyJanuary
56,279740225
1012,5571,480450
1518,8362,220675

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bolhradskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.