Solar plant: site data

Solar power plant in Mykolayivka-Novorosiyska, Bilhorod-Dnistrovskyi Raion, Odesa Oblast

Mykolayivka-Novorosiyska: 1,267 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.8% above the oblast median (1,221). #94 of 134 in the rayon, #242 of 1177 in the oblast.

Bilhorod-Dnistrovskyi, the rayon centre, is 35 km away. 24 m above sea level. 35 km away: Bilhorod-Dnistrovskyi, the nearest bigger centre, 1,288 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Одеса, 74 km. 9.05 m between rows, pitch 12.92 m (latitude 46.1°).

Yield of 1 kWp
1,267kWh/year
Tilt
36°3° east of south
10 kW
12,667kWh/year
Row pitch
12.92m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Mykolayivka-Novorosiyska

The designer opens with this place’s coordinates, latitude 46.1° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 74 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan65Feb109Mar129Apr145May142Jun149Jul151Aug128Sep102Oct57Nov44Dec

August: 151 kWh/kWp, December: 44 — 3.4 times less.

December: 44 against 38 in the oblast, 15.8% more.

Mykolayivka-Novorosiyska: plants, kWh
kWpA yearAugustDecember
56,334755220
1012,6671,510440
1519,0012,265660

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilhorod-Dnistrovskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.