Solar plant: site data
Solar power plant in Lisky, Odeskyi Raion, Odesa Oblast
Lisky: 1,281 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 4.9% above the oblast median (1,221). #44 of 154 in the rayon, #170 of 1177 in the oblast.
Odesa, the rayon centre, is 10 km away. 40 m above sea level. 10 km away: Odesa, the nearest bigger centre, 1,264 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Одеса, 11 km. 9.52 m between rows, pitch 13.34 m (latitude 46.6°).
- Yield of 1 kWp
- 1,281kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 12,806kWh/year
- Row pitch
- 13.34m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 880 / 460Pa
Ground frame designer
A ground frame for a solar plant: Lisky
The designer opens with this place’s coordinates, latitude 46.6° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 11 km: snow 880 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 156 kWh/kWp, December: 42 — 3.7 times less.
January: 52 against 40 in the oblast, 30.0% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,403 | 780 | 210 |
| 10 | 12,806 | 1,560 | 420 |
| 15 | 19,209 | 2,340 | 630 |
Example: a 10 kW ground frame
For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.