Solar plant: site data

Solar power plant in Kosivka, Bilhorod-Dnistrovskyi Raion, Odesa Oblast

Kosivka: 1,298 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 6.3% above the oblast median (1,221). #51 of 134 in the rayon, #83 of 1177 in the oblast.

Bilhorod-Dnistrovskyi, the rayon centre, is 22 km away. 12 m above sea level. 22 km away: Bilhorod-Dnistrovskyi, the nearest bigger centre, 1,288 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Одеса, 62 km. 8.97 m between rows, pitch 12.84 m (latitude 46.0°).

Yield of 1 kWp
1,298kWh/year
Tilt
36°1° west of south
10 kW
12,977kWh/year
Row pitch
12.84m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Kosivka

The designer opens with this place’s coordinates, latitude 46.0° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 62 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

54Jan68Feb111Mar130Apr150May147Jun156Jul156Aug130Sep98Oct54Nov45Dec

July: 156 kWh/kWp, December: 45 — 3.5 times less.

January: 54 against 40 in the oblast, 35.0% more.

Kosivka: plants, kWh
kWpA yearJulyDecember
56,489780225
1012,9771,560450
1519,4662,340675

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilhorod-Dnistrovskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.