Solar plant: site data

Solar power plant in Hulianka, Podilskyi Raion, Odesa Oblast

Hulianka: 1,196 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.1% below the oblast median (1,221). #11 of 301 in the rayon, #823 of 1177 in the oblast.

Balta, the rayon centre, is 62 km away. 75 m above sea level. 17 km away: Okny, the nearest bigger centre, the same 1,190. Snow and wind from the nearest regional centre in the DBN — Одеса, 144 km. 9.81 m between rows, pitch 13.68 m (latitude 47.4°).

Yield of 1 kWp
1,196kWh/year
Tilt
36°3° east of south
10 kW
11,956kWh/year
Row pitch
13.68m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Hulianka

The designer opens with this place’s coordinates, latitude 47.4° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 144 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan54Feb102Mar122Apr139May141Jun150Jul146Aug121Sep97Oct51Nov35Dec

July: 150 kWh/kWp, December: 35 — 4.3 times less.

December: 35 against 38 in the oblast, 7.9% less.

Hulianka: plants, kWh
kWpA yearJulyDecember
55,978750175
1011,9561,500350
1517,9342,250525

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Podilskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.