Solar plant: site data

Solar power plant in Dmytrivka, Bolhradskyi Raion, Odesa Oblast

Dmytrivka: 1,260 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.2% above the oblast median (1,221). #35 of 99 in the rayon, #283 of 1177 in the oblast.

Bolhrad, the rayon centre, is 43 km away. 56 m above sea level. 43 km away: Bolhrad, the nearest bigger centre, 1,283 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Одеса, 146 km. 8.96 m between rows, pitch 12.83 m (latitude 46.0°).

Yield of 1 kWp
1,260kWh/year
Tilt
36°3° east of south
10 kW
12,597kWh/year
Row pitch
12.83m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Dmytrivka

The designer opens with this place’s coordinates, latitude 46.0° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 146 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan63Feb109Mar126Apr142May140Jun149Jul148Aug127Sep103Oct59Nov46Dec

July: 149 kWh/kWp, January: 46 — 3.2 times less.

December: 46 against 38 in the oblast, 21.1% more.

Dmytrivka: plants, kWh
kWpA yearJulyJanuary
56,299745230
1012,5971,490460
1518,8962,235690

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bolhradskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.