Solar plant: site data

Solar power plant in Velyke Artakove, Bashtanskyi Raion, Mykolaiv Oblast

Velyke Artakove: 1,216 kWh per kWp a year, tilt 36° 6° east of south (PVGIS). 1.5% above the oblast median (1,198). #80 of 279 in the rayon, #288 of 909 in the oblast.

Novyi Buh, the rayon centre, is 67 km away. 7 m above sea level. 19 km away: Bereznehuvate, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Херсон, 73 km. 9.69 m between rows, pitch 13.56 m (latitude 47.2°).

Yield of 1 kWp
1,216kWh/year
Tilt
36°6° east of south
10 kW
12,159kWh/year
Row pitch
13.56m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Velyke Artakove

The designer opens with this place’s coordinates, latitude 47.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 73 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan57Feb102Mar124Apr141May143Jun152Jul152Aug127Sep96Oct49Nov34Dec

July: 152 kWh/kWp, December: 34 — 4.5 times less.

February: 57 against 54 in the oblast, 5.6% more.

Velyke Artakove: plants, kWh
kWpA yearJulyDecember
56,080760170
1012,1591,520340
1518,2392,280510

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bashtanskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.