Solar plant: site data
Solar power plant in Bereznehuvate, Bashtanskyi Raion, Mykolaiv Oblast
Bereznehuvate: 1,222 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.0% above the oblast median (1,198). #61 of 279 in the rayon, #258 of 909 in the oblast.
Novyi Buh, the rayon centre, is 61 km away. 27 m above sea level. 13 km away: Bereznehuvate, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Херсон, 73 km. 9.71 m between rows, pitch 13.58 m (latitude 47.2°).
- Yield of 1 kWp
- 1,222kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 12,220kWh/year
- Row pitch
- 13.58m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Bereznehuvate
The designer opens with this place’s coordinates, latitude 47.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 73 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 152 kWh/kWp, December: 34 — 4.5 times less.
November: 51 against 48 in the oblast, 6.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,110 | 760 | 170 |
| 10 | 12,220 | 1,520 | 340 |
| 15 | 18,330 | 2,280 | 510 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Kalynivka2 km1,221 kWh/kWp
- Murakhivka2 km1,223 kWh/kWp
- Ternivka5 km1,223 kWh/kWp
- Velyke Artakove6 km1,216 kWh/kWp
- Ternovyi Yar7 km1,208 kWh/kWp
- Blahodativka8 km1,223 kWh/kWp
All places: Bashtanskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.