Solar power plant in Trykraty, Voznesenskyi Raion, Mykolaiv Oblast
Trykraty: 1,186 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.0% below the oblast median (1,198). #158 of 252 in the rayon, #612 of 909 in the oblast.
Voznesensk, the rayon centre, is 18 km away. 56 m above sea level. 18 km away: Voznesensk, the nearest bigger centre, 1,192 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 94 km. 10.02 m between rows, pitch 13.89 m (latitude 47.7°).
- Yield of 1 kWp
- 1,186kWh/year
- Tilt
- 36°4° east of south
- 10 kW
- 11,861kWh/year
- Row pitch
- 13.89m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 870 / 470Pa
Ground frame designer
A ground frame for a solar plant: Trykraty
The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 94 km: snow 870 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 151 kWh/kWp, December: 33 — 4.6 times less.
January: 36 against 38 in the oblast, 5.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,931 | 755 | 165 |
| 10 | 11,861 | 1,510 | 330 |
| 15 | 17,792 | 2,265 | 495 |
Example: a 10 kW ground frame
For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.
How these numbers are computed
Nearby
- Aktove4 km1,184 kWh/kWp
- Zorya5 km1,189 kWh/kWp
- Vilnyy Yar6 km1,190 kWh/kWp
- Voronivka7 km1,188 kWh/kWp
- Petropavlivka7 km1,186 kWh/kWp
- Trykratne8 km1,188 kWh/kWp
All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.