Solar plant: site data

Solar power plant in Petropavlivka, Voznesenskyi Raion, Mykolaiv Oblast

Petropavlivka: 1,186 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.0% below the oblast median (1,198). #162 of 252 in the rayon, #619 of 909 in the oblast.

Voznesensk, the rayon centre, is 23 km away. 73 m above sea level. 23 km away: Voznesensk, the nearest bigger centre, 1,192 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 93 km. 10.03 m between rows, pitch 13.90 m (latitude 47.7°).

Yield of 1 kWp
1,186kWh/year
Tilt
36°4° east of south
10 kW
11,857kWh/year
Row pitch
13.90m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Petropavlivka

The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 93 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan53Feb99Mar123Apr139May141Jun152Jul148Aug122Sep94Oct47Nov33Dec

July: 152 kWh/kWp, December: 33 — 4.6 times less.

January: 37 against 38 in the oblast, 2.6% less.

Petropavlivka: plants, kWh
kWpA yearJulyDecember
55,929760165
1011,8571,520330
1517,7862,280495

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.