Solar plant: site data

Solar power plant in Troyitske, Mykolaivskyi Raion, Mykolaiv Oblast

Troyitske: 1,221 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.0% above the oblast median (1,198). #198 of 238 in the rayon, #260 of 909 in the oblast.

Mykolayiv, the rayon centre, is 44 km away. 57 m above sea level. 3 km away: Nova Odesa, the nearest bigger centre, 1,212 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 45 km. 9.77 m between rows, pitch 13.64 m (latitude 47.3°).

Yield of 1 kWp
1,221kWh/year
Tilt
36°3° east of south
10 kW
12,213kWh/year
Row pitch
13.64m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Troyitske

The designer opens with this place’s coordinates, latitude 47.3° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 45 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan59Feb105Mar125Apr141May141Jun152Jul149Aug125Sep97Oct50Nov35Dec

July: 152 kWh/kWp, December: 35 — 4.3 times less.

January: 42 against 38 in the oblast, 10.5% more.

Troyitske: plants, kWh
kWpA yearJulyDecember
56,107760175
1012,2131,520350
1518,3202,280525

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.