Solar plant: site data

Solar power plant in Syrove, Pervomaiskyi Raion, Mykolaiv Oblast

Syrove: 1,179 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.6% below the oblast median (1,198). #27 of 140 in the rayon, #717 of 909 in the oblast.

Pervomaysk, the rayon centre, is 34 km away. 91 m above sea level. 34 km away: Pervomaysk, the nearest bigger centre, 1,169 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 151 km. 10.14 m between rows, pitch 14.01 m (latitude 47.9°).

Yield of 1 kWp
1,179kWh/year
Tilt
36°4° east of south
10 kW
11,791kWh/year
Row pitch
14.01m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Syrove

The designer opens with this place’s coordinates, latitude 47.9° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 151 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan53Feb98Mar122Apr139May141Jun150Jul147Aug120Sep93Oct44Nov33Dec

July: 150 kWh/kWp, December: 33 — 4.5 times less.

November: 44 against 48 in the oblast, 8.3% less.

Syrove: plants, kWh
kWpA yearJulyDecember
55,896750165
1011,7911,500330
1517,6872,250495

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pervomaiskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.