Solar plant: site data

Solar power plant in Kryve Ozero, Pervomaiskyi Raion, Mykolaiv Oblast

Kryve Ozero: 1,169 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.4% below the oblast median (1,198). #88 of 140 in the rayon, #841 of 909 in the oblast.

Pervomaysk, the rayon centre, is 39 km away. 96 m above sea level. 39 km away: Pervomaysk, the nearest bigger centre, the same 1,169. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 156 km. 10.17 m between rows, pitch 14.04 m (latitude 47.9°).

Yield of 1 kWp
1,169kWh/year
Tilt
36°3° east of south
10 kW
11,694kWh/year
Row pitch
14.04m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Kryve Ozero

The designer opens with this place’s coordinates, latitude 47.9° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 156 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan51Feb96Mar122Apr139May142Jun150Jul146Aug120Sep92Oct43Nov32Dec

July: 150 kWh/kWp, December: 32 — 4.7 times less.

November: 43 against 48 in the oblast, 10.4% less.

Kryve Ozero: plants, kWh
kWpA yearJulyDecember
55,847750160
1011,6941,500320
1517,5412,250480

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pervomaiskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.