Solar plant: site data
Solar power plant in Solonchaky, Mykolaivskyi Raion, Mykolaiv Oblast
Solonchaky: 1,272 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 6.2% above the oblast median (1,198). #37 of 238 in the rayon, #37 of 909 in the oblast.
Mykolayiv, the rayon centre, is 39 km away. 29 m above sea level. 39 km away: Mykolayiv, the nearest bigger centre, 1,253 — 1.5% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 39 km. 9.34 m between rows, pitch 13.21 m (latitude 46.6°).
- Yield of 1 kWp
- 1,272kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 12,722kWh/year
- Row pitch
- 13.21m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 870 / 470Pa
Ground frame designer
A ground frame for a solar plant: Solonchaky
The designer opens with this place’s coordinates, latitude 46.6° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 39 km: snow 870 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 157 kWh/kWp, December: 41 — 3.8 times less.
December: 41 against 33 in the oblast, 24.2% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,361 | 785 | 205 |
| 10 | 12,722 | 1,570 | 410 |
| 15 | 19,083 | 2,355 | 615 |
Example: a 10 kW ground frame
For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.
How these numbers are computed
Nearby
- Dniprovske4 km1,266 kWh/kWp
- Dmytrivka6 km1,274 kWh/kWp
- Parutyne9 km1,277 kWh/kWp
- Yaselka9 km1,275 kWh/kWp
- Chervone Parutyne10 km1,286 kWh/kWp
- Matrosivka11 km1,294 kWh/kWp
All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.