Solar plant: site data

Solar power plant in Chervone Parutyne, Mykolaivskyi Raion, Mykolaiv Oblast

Chervone Parutyne: 1,286 kWh per kWp a year, tilt 37° facing south (PVGIS). 7.4% above the oblast median (1,198). #20 of 238 in the rayon, #20 of 909 in the oblast.

Mykolayiv, the rayon centre, is 29 km away. 41 m above sea level. 29 km away: Mykolayiv, the nearest bigger centre, 1,253 — 2.6% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 29 km. 9.62 m between rows, pitch 13.44 m (latitude 46.7°).

Yield of 1 kWp
1,286kWh/year
Tilt
37°facing south
10 kW
12,862kWh/year
Row pitch
13.44m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Chervone Parutyne

The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 29 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan65Feb110Mar132Apr147May145Jun156Jul155Aug131Sep102Oct55Nov40Dec

July: 156 kWh/kWp, December: 40 — 3.9 times less.

January: 47 against 38 in the oblast, 23.7% more.

Chervone Parutyne: plants, kWh
kWpA yearJulyDecember
56,431780200
1012,8621,560400
1519,2932,340600

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.