Solar plant: site data

Solar power plant in Mykhaylivka, Mykolaivskyi Raion, Mykolaiv Oblast

Mykhaylivka: 1,266 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 5.7% above the oblast median (1,198). #52 of 238 in the rayon, #52 of 909 in the oblast.

Mykolayiv, the rayon centre, is 24 km away. 45 m above sea level. 24 km away: Mykolayiv, the nearest bigger centre, 1,253 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 24 km. 9.66 m between rows, pitch 13.48 m (latitude 46.8°).

Yield of 1 kWp
1,266kWh/year
Tilt
37°1° east of south
10 kW
12,656kWh/year
Row pitch
13.48m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Mykhaylivka

The designer opens with this place’s coordinates, latitude 46.8° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 24 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan63Feb108Mar130Apr145May143Jun154Jul153Aug129Sep100Oct54Nov39Dec

July: 154 kWh/kWp, December: 39 — 3.9 times less.

January: 46 against 38 in the oblast, 21.1% more.

Mykhaylivka: plants, kWh
kWpA yearJulyDecember
56,328770195
1012,6561,540390
1518,9842,310585

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.