Solar power plant in Slyvyne, Mykolaivskyi Raion, Mykolaiv Oblast

Slyvyne: 1,237 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 3.2% above the oblast median (1,198). #154 of 238 in the rayon, #173 of 909 in the oblast.

Mykolayiv, the rayon centre, is 11 km away. 22 m above sea level. 11 km away: Mykolayiv, the nearest bigger centre, 1,253 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 11 km. 9.79 m between rows, pitch 13.61 m (latitude 47.0°).

Yield of 1 kWp
1,237kWh/year
Tilt
37°2° east of south
10 kW
12,367kWh/year
Row pitch
13.61m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Slyvyne

The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 11 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan62Feb106Mar127Apr141May140Jun152Jul151Aug127Sep98Oct52Nov37Dec

July: 152 kWh/kWp, December: 37 — 4.1 times less.

January: 44 against 38 in the oblast, 15.8% more.

Slyvyne: plants, kWh
kWpA yearJulyDecember
56,184760185
1012,3671,520370
1518,5512,280555

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.