Solar plant: site data

Solar power plant in Novooleksandrivské, Mykolaivskyi Raion, Mykolaiv Oblast

Novooleksandrivské: 1,197 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). Exactly the oblast median (1,198). #233 of 238 in the rayon, #466 of 909 in the oblast.

Mykolayiv, the rayon centre, is 55 km away. 93 m above sea level. 20 km away: Nova Odesa, the nearest bigger centre, 1,212 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 55 km. 9.85 m between rows, pitch 13.72 m (latitude 47.5°).

Yield of 1 kWp
1,197kWh/year
Tilt
36°4° east of south
10 kW
11,974kWh/year
Row pitch
13.72m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Novooleksandrivské

The designer opens with this place’s coordinates, latitude 47.5° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 55 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan54Feb100Mar123Apr138May140Jun153Jul149Aug124Sep97Oct48Nov33Dec

July: 153 kWh/kWp, December: 33 — 4.6 times less.

June: 140 against 142 in the oblast, 1.4% less.

Novooleksandrivské: plants, kWh
kWpA yearJulyDecember
55,987765165
1011,9741,530330
1517,9612,295495

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.