Solar plant: site data
Solar power plant in Novokyyivka, Mykolaivskyi Raion, Mykolaiv Oblast
Novokyyivka: 1,243 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.8% above the oblast median (1,198). #117 of 238 in the rayon, #122 of 909 in the oblast.
Mykolayiv, the rayon centre, is 41 km away. 45 m above sea level. 27 km away: Kherson, the nearest bigger centre, 1,276 — 2.6% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 26 km. 9.47 m between rows, pitch 13.34 m (latitude 46.9°).
- Yield of 1 kWp
- 1,243kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 12,434kWh/year
- Row pitch
- 13.34m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Novokyyivka
The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 26 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 152 kWh/kWp, December: 38 — 4.0 times less.
December: 38 against 33 in the oblast, 15.2% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,217 | 760 | 190 |
| 10 | 12,434 | 1,520 | 380 |
| 15 | 18,651 | 2,280 | 570 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Bohorodytske2 km1,251 kWh/kWp
- Shmidtove3 km1,244 kWh/kWp
- Tsentralne5 km1,241 kWh/kWp
- Znamyanka6 km1,241 kWh/kWp
- Zahorianivka6 km1,248 kWh/kWp
- Huliaihorodok7 km1,242 kWh/kWp
All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.