Solar plant: site data

Solar power plant in Chornomorka, Mykolaivskyi Raion, Mykolaiv Oblast

Chornomorka: 1,289 kWh per kWp a year, tilt 37° facing south (PVGIS). 7.6% above the oblast median (1,198). #14 of 238 in the rayon, #14 of 909 in the oblast.

Mykolayiv, the rayon centre, is 53 km away. 12 m above sea level. 25 km away: Berezanka, the nearest bigger centre, 1,260 — 2.3% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 52 km. 9.56 m between rows, pitch 13.38 m (latitude 46.6°).

Yield of 1 kWp
1,289kWh/year
Tilt
37°facing south
10 kW
12,893kWh/year
Row pitch
13.38m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Chornomorka

The designer opens with this place’s coordinates, latitude 46.6° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 52 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

49Jan65Feb109Mar132Apr148May147Jun158Jul154Aug130Sep101Oct55Nov42Dec

July: 158 kWh/kWp, December: 42 — 3.8 times less.

January: 49 against 38 in the oblast, 28.9% more.

Chornomorka: plants, kWh
kWpA yearJulyDecember
56,447790210
1012,8931,580420
1519,3402,370630

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.