Solar plant: site data

Solar power plant in Tudorkovychi, Sheptytskyi Raion, Lviv Oblast

Tudorkovychi: 1,093 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.8% above the oblast median (1,084). #94 of 207 in the rayon, #363 of 1532 in the oblast.

Sheptytskyi, the rayon centre, is 21 km away. 201 m above sea level. 21 km away: Sheptytskyi, the nearest bigger centre, 1,079 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Львів, 83 km. 12.94 m between rows, pitch 16.71 m (latitude 50.6°).

Yield of 1 kWp
1,093kWh/year
Tilt
38°1° east of south
10 kW
10,927kWh/year
Row pitch
16.71m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Tudorkovychi

The designer opens with this place’s coordinates, latitude 50.6° for the row spacing and the DBN loads of the nearest regional centre — Львів, 83 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan50Feb95Mar118Apr130May135Jun136Jul133Aug109Sep84Oct41Nov29Dec

July: 136 kWh/kWp, December: 29 — 4.7 times less.

January: 32 against 39 in the oblast, 17.9% less.

Tudorkovychi: plants, kWh
kWpA yearJulyDecember
55,464680145
1010,9271,360290
1516,3912,040435

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sheptytskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.