Solar power plant in Sukhyi Potik, Stryiskyi Raion, Lviv Oblast

Sukhyi Potik: 990 kWh per kWp a year, tilt 35° 5° east of south (PVGIS). 8.7% below the oblast median (1,084). #278 of 286 in the rayon, #1517 of 1532 in the oblast.

Stryi, the rayon centre, is 52 km away. 794 m above sea level — above 500 m the DBN snow and wind are higher. 44 km away: Drohobych, the nearest bigger centre, 1,073 — 7.8% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 81 km. 10.68 m between rows, pitch 14.60 m (latitude 49.0°).

Yield of 1 kWp
990kWh/year
Tilt
35°5° east of south
10 kW
9,900kWh/year
Row pitch
14.60m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Sukhyi Potik

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 81 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan53Feb85Mar106Apr113May117Jun124Jul124Aug100Sep76Oct39Nov20Dec

July: 124 kWh/kWp, December: 20 — 6.2 times less.

December: 20 against 32 in the oblast, 37.5% less.

Sukhyi Potik: plants, kWh
kWpA yearJulyDecember
54,950620100
109,9001,240200
1514,8501,860300

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed