Solar plant: site data

Solar power plant in Soroky-Lvivski, Lvivskyi Raion, Lviv Oblast

Soroky-Lvivski: 1,099 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.4% above the oblast median (1,084). #40 of 356 in the rayon, #99 of 1532 in the oblast.

Lviv, the rayon centre, is 8 km away. 220 m above sea level. 8 km away: Lviv, the nearest bigger centre, 1,084 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Львів, 7 km. 12.24 m between rows, pitch 16.01 m (latitude 49.9°).

Yield of 1 kWp
1,099kWh/year
Tilt
38°1° east of south
10 kW
10,987kWh/year
Row pitch
16.01m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Soroky-Lvivski

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Львів, 7 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan57Feb95Mar115Apr125May127Jun134Jul132Aug109Sep86Oct44Nov34Dec

July: 134 kWh/kWp, December: 34 — 3.9 times less.

December: 34 against 32 in the oblast, 6.3% more.

Soroky-Lvivski: plants, kWh
kWpA yearJulyDecember
55,494670170
1010,9871,340340
1516,4812,010510

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lvivskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.