Lisinichi: 1,093 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.8% above the oblast median (1,084). #146 of 356 in the rayon, #349 of 1532 in the oblast.

Lviv, the rayon centre, is 7 km away. 271 m above sea level. 7 km away: Lviv, the nearest bigger centre, 1,084 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Львів, 6 km. 12.21 m between rows, pitch 15.98 m (latitude 49.8°).

Yield of 1 kWp
1,093kWh/year
Tilt
38°1° east of south
10 kW
10,930kWh/year
Row pitch
15.98m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Lisinichi

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Львів, 6 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan56Feb95Mar115Apr125May128Jun134Jul132Aug109Sep85Oct44Nov32Dec

July: 134 kWh/kWp, December: 32 — 4.2 times less.

March: 95 against 93 in the oblast, 2.2% more.

Lisinichi: plants, kWh
kWpA yearJulyDecember
55,465670160
1010,9301,340320
1516,3952,010480

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed