Solar plant: site data

Solar power plant in Smykiv, Sheptytskyi Raion, Lviv Oblast

Smykiv: 1,101 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.5% above the oblast median (1,084). #12 of 207 in the rayon, #35 of 1532 in the oblast.

Sheptytskyi, the rayon centre, is 23 km away. 231 m above sea level. 23 km away: Sheptytskyi, the nearest bigger centre, 1,079 — 2.0% more here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 64 km. 12.84 m between rows, pitch 16.61 m (latitude 50.5°).

Yield of 1 kWp
1,101kWh/year
Tilt
38°1° east of south
10 kW
11,005kWh/year
Row pitch
16.61m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Smykiv

The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 64 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan53Feb97Mar118Apr130May135Jun136Jul135Aug109Sep84Oct41Nov29Dec

July: 136 kWh/kWp, December: 29 — 4.7 times less.

January: 33 against 39 in the oblast, 15.4% less.

Smykiv: plants, kWh
kWpA yearJulyDecember
55,503680145
1011,0051,360290
1516,5082,040435

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sheptytskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.