Solar power plant in Rohali, Sheptytskyi Raion, Lviv Oblast
Rohali: 1,091 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.7% above the oblast median (1,084). #109 of 207 in the rayon, #415 of 1532 in the oblast.
Sheptytskyi, the rayon centre, is 24 km away. 202 m above sea level. 24 km away: Sheptytskyi, the nearest bigger centre, 1,079 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Львів, 45 km. 12.55 m between rows, pitch 16.32 m (latitude 50.2°).
- Yield of 1 kWp
- 1,091kWh/year
- Tilt
- 38°1° east of south
- 10 kW
- 10,914kWh/year
- Row pitch
- 16.32m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,310 / 520Pa
Ground frame designer
A ground frame for a solar plant: Rohali
The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Львів, 45 km: snow 1,310 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 134 kWh/kWp, December: 33 — 4.1 times less.
December: 33 against 32 in the oblast, 3.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,457 | 670 | 165 |
| 10 | 10,914 | 1,340 | 330 |
| 15 | 16,371 | 2,010 | 495 |
Example: a 10 kW ground frame
For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.