Solar plant: site data

Solar power plant in Nyzhnii Turiv, Sambirskyi Raion, Lviv Oblast

Nyzhnii Turiv: 1,039 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 4.1% below the oblast median (1,084). #211 of 264 in the rayon, #1423 of 1532 in the oblast.

Sambir, the rayon centre, is 51 km away. 634 m above sea level — above 500 m the DBN snow and wind are higher. 51 km away: Drohobych, the nearest bigger centre, 1,073 — 3.2% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 70 km. 11.29 m between rows, pitch 15.11 m (latitude 49.1°).

Yield of 1 kWp
1,039kWh/year
Tilt
37°3° east of south
10 kW
10,391kWh/year
Row pitch
15.11m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Nyzhnii Turiv

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 70 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan59Feb89Mar107Apr113May118Jun126Jul126Aug102Sep80Oct46Nov30Dec

July: 126 kWh/kWp, December: 30 — 4.2 times less.

May: 113 against 124 in the oblast, 8.9% less.

Nyzhnii Turiv: plants, kWh
kWpA yearJulyDecember
55,196630150
1010,3911,260300
1515,5861,890450

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sambirskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.