Solar plant: site data
Solar power plant in Kulykiv, Sheptytskyi Raion, Lviv Oblast
Kulykiv: 1,098 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.3% above the oblast median (1,084). #39 of 207 in the rayon, #105 of 1532 in the oblast.
Sheptytskyi, the rayon centre, is 42 km away. 214 m above sea level. 42 km away: Sheptytskyi, the nearest bigger centre, 1,079 — 1.8% more here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 61 km. 12.67 m between rows, pitch 16.44 m (latitude 50.3°).
- Yield of 1 kWp
- 1,098kWh/year
- Tilt
- 38°1° east of south
- 10 kW
- 10,984kWh/year
- Row pitch
- 16.44m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,240 / 480Pa
Ground frame designer
A ground frame for a solar plant: Kulykiv
The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 61 km: snow 1,240 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 136 kWh/kWp, December: 29 — 4.7 times less.
January: 34 against 39 in the oblast, 12.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,492 | 680 | 145 |
| 10 | 10,984 | 1,360 | 290 |
| 15 | 16,476 | 2,040 | 435 |
Example: a 10 kW ground frame
For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.