Solar power plant in Kulychkiv, Sheptytskyi Raion, Lviv Oblast

Kulychkiv: 1,079 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,084). #199 of 207 in the rayon, #1012 of 1532 in the oblast.

Sheptytskyi, the rayon centre, is 15 km away. 203 m above sea level. 15 km away: Sheptytskyi, the nearest bigger centre, the same 1,079. Snow and wind from the nearest regional centre in the DBN — Львів, 52 km. 12.66 m between rows, pitch 16.43 m (latitude 50.3°).

Yield of 1 kWp
1,079kWh/year
Tilt
38°2° east of south
10 kW
10,793kWh/year
Row pitch
16.43m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Kulychkiv

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Львів, 52 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan56Feb93Mar114Apr124May128Jun132Jul131Aug106Sep82Oct42Nov33Dec

July: 132 kWh/kWp, December: 33 — 4.0 times less.

November: 42 against 44 in the oblast, 4.5% less.

Kulychkiv: plants, kWh
kWpA yearJulyDecember
55,397660165
1010,7931,320330
1516,1901,980495

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed