Solar plant: site data

Solar power plant in Kindrativ, Sambirskyi Raion, Lviv Oblast

Kindrativ: 1,019 kWh per kWp a year, tilt 38° 9° east of south (PVGIS). 6.0% below the oblast median (1,084). #253 of 264 in the rayon, #1491 of 1532 in the oblast.

Sambir, the rayon centre, is 38 km away. 609 m above sea level — above 500 m the DBN snow and wind are higher. 31 km away: Drohobych, the nearest bigger centre, 1,073 — 5.1% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 89 km. 11.62 m between rows, pitch 15.39 m (latitude 49.2°).

Yield of 1 kWp
1,019kWh/year
Tilt
38°9° east of south
10 kW
10,188kWh/year
Row pitch
15.39m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Kindrativ

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 89 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan56Feb85Mar104Apr112May114Jun123Jul122Aug100Sep79Oct48Nov34Dec

July: 123 kWh/kWp, December: 34 — 3.6 times less.

June: 114 against 127 in the oblast, 10.2% less.

Kindrativ: plants, kWh
kWpA yearJulyDecember
55,094615170
1010,1881,230340
1515,2821,845510

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sambirskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.