Solar plant: site data

Solar power plant in Khvatuv, Zolochivskyi Raion, Lviv Oblast

Khvatuv: 1,074 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.9% below the oblast median (1,084). #158 of 180 in the rayon, #1234 of 1532 in the oblast.

Zolochiv, the rayon centre, is 17 km away. 253 m above sea level. 17 km away: Zolochiv, the nearest bigger centre, 1,081 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 65 km. 12.05 m between rows, pitch 15.87 m (latitude 50.0°).

Yield of 1 kWp
1,074kWh/year
Tilt
37°2° east of south
10 kW
10,736kWh/year
Row pitch
15.87m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Khvatuv

The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 65 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb90Mar114Apr126May129Jun134Jul133Aug107Sep83Oct41Nov29Dec

July: 134 kWh/kWp, December: 29 — 4.6 times less.

January: 35 against 39 in the oblast, 10.3% less.

Khvatuv: plants, kWh
kWpA yearJulyDecember
55,368670145
1010,7361,340290
1516,1042,010435

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolochivskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.