Solar plant: site data

Solar power plant in Hutyshche, Zolochivskyi Raion, Lviv Oblast

Hutyshche: 1,065 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 1.7% below the oblast median (1,084). #174 of 180 in the rayon, #1312 of 1532 in the oblast.

Zolochiv, the rayon centre, is 13 km away. 317 m above sea level. 13 km away: Zolochiv, the nearest bigger centre, 1,081 — 1.5% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 62 km. 12.01 m between rows, pitch 15.83 m (latitude 49.9°).

Yield of 1 kWp
1,065kWh/year
Tilt
37°3° east of south
10 kW
10,649kWh/year
Row pitch
15.83m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Hutyshche

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 62 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan53Feb90Mar112Apr124May128Jun132Jul131Aug107Sep82Oct39Nov30Dec

July: 132 kWh/kWp, December: 30 — 4.4 times less.

November: 39 against 44 in the oblast, 11.4% less.

Hutyshche: plants, kWh
kWpA yearJulyDecember
55,325660150
1010,6491,320300
1515,9741,980450

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolochivskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.