Solar plant: site data

Solar power plant in Uralo-Kavkaz, Dovzhanskyi Raion, Luhansk Oblast

Uralo-Kavkaz: 1,162 kWh per kWp a year, tilt 37° facing south (PVGIS). 1.0% above the oblast median (1,150). #29 of 108 in the rayon, #49 of 964 in the oblast.

Dovzhansk, the rayon centre, is 30 km away. 115 m above sea level. 30 km away: Dovzhansk, the nearest bigger centre, 1,149 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Харків, 319 km. 10.69 m between rows, pitch 14.51 m (latitude 48.3°).

Yield of 1 kWp
1,162kWh/year
Tilt
37°facing south
10 kW
11,616kWh/year
Row pitch
14.51m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Uralo-Kavkaz

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Харків, 319 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan56Feb91Mar117Apr139May143Jun144Jul147Aug124Sep88Oct46Nov28Dec

August: 147 kWh/kWp, December: 28 — 5.3 times less.

December: 28 against 26 in the oblast, 7.7% more.

Uralo-Kavkaz: plants, kWh
kWpA yearAugustDecember
55,808735140
1011,6161,470280
1517,4242,205420

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Dovzhanskyi RaionLuhansk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.