Stara Krasnianka: 1,140 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.8% below the oblast median (1,150). #87 of 100 in the rayon, #689 of 964 in the oblast.

Siverskodonetsk, the rayon centre, is 18 km away. 67 m above sea level. 18 km away: Siverskodonetsk, the nearest bigger centre, 1,150 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 184 km. 11.24 m between rows, pitch 15.06 m (latitude 49.0°).

Yield of 1 kWp
1,140kWh/year
Tilt
37°1° east of south
10 kW
11,403kWh/year
Row pitch
15.06m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Stara Krasnianka

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Харків, 184 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan60Feb92Mar114Apr135May139Jun142Jul144Aug119Sep84Oct42Nov27Dec

August: 144 kWh/kWp, December: 27 — 5.3 times less.

February: 60 against 56 in the oblast, 7.1% more.

Stara Krasnianka: plants, kWh
kWpA yearAugustDecember
55,702720135
1011,4031,440270
1517,1052,160405

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed