Solar plant: site data

Solar power plant in Sievero-Hundorivskyi, Dovzhanskyi Raion, Luhansk Oblast

Sievero-Hundorivskyi: 1,163 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 1.2% above the oblast median (1,150). #20 of 108 in the rayon, #32 of 964 in the oblast.

Dovzhansk, the rayon centre, is 37 km away. 152 m above sea level. 37 km away: Dovzhansk, the nearest bigger centre, 1,149 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Харків, 321 km. 10.48 m between rows, pitch 14.35 m (latitude 48.4°).

Yield of 1 kWp
1,163kWh/year
Tilt
36°1° west of south
10 kW
11,632kWh/year
Row pitch
14.35m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Sievero-Hundorivskyi

The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Харків, 321 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan58Feb90Mar117Apr139May143Jun144Jul147Aug124Sep86Oct46Nov29Dec

August: 147 kWh/kWp, December: 29 — 5.1 times less.

December: 29 against 26 in the oblast, 11.5% more.

Sievero-Hundorivskyi: plants, kWh
kWpA yearAugustDecember
55,816735145
1011,6321,470290
1517,4482,205435

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks