Solar power plant in Leonove, Rovenkivskyi Raion, Luhansk Oblast

Leonove: 1,166 kWh per kWp a year, tilt 35° 1° west of south (PVGIS). 1.4% above the oblast median (1,150). #2 of 96 in the rayon, #6 of 964 in the oblast.

Rovenky, the rayon centre, is 32 km away. 162 m above sea level. 32 km away: Rovenky, the nearest bigger centre, 1,157 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 298 km. 9.86 m between rows, pitch 13.78 m (latitude 47.9°).

Yield of 1 kWp
1,166kWh/year
Tilt
35°1° west of south
10 kW
11,664kWh/year
Row pitch
13.78m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Leonove

The designer opens with this place’s coordinates, latitude 47.9° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 298 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb87Mar117Apr138May144Jun148Jul151Aug126Sep91Oct47Nov28Dec

August: 151 kWh/kWp, December: 28 — 5.4 times less.

January: 35 against 39 in the oblast, 10.3% less.

Leonove: plants, kWh
kWpA yearAugustDecember
55,832755140
1011,6641,510280
1517,4962,265420

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 382 kg of steel, 14 piles, materials ≈ 50,687 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Rovenkivskyi RaionLuhansk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.