Solar plant: site data

Solar power plant in Torchytskyi Stepok, Bilotserkivskyi Raion, Kyiv Oblast

Torchytskyi Stepok: 1,134 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.0% above the oblast median (1,122). #42 of 260 in the rayon, #187 of 1071 in the oblast.

Bila Tserkva, the rayon centre, is 52 km away. 217 m above sea level. 52 km away: Bila Tserkva, the nearest bigger centre, 1,122 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 117 km. 11.22 m between rows, pitch 15.09 m (latitude 49.3°).

Yield of 1 kWp
1,134kWh/year
Tilt
36°3° east of south
10 kW
11,338kWh/year
Row pitch
15.09m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Torchytskyi Stepok

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 117 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb88Mar119Apr138May143Jun146Jul143Aug115Sep87Oct38Nov30Dec

July: 146 kWh/kWp, December: 30 — 4.9 times less.

December: 30 against 27 in the oblast, 11.1% more.

Torchytskyi Stepok: plants, kWh
kWpA yearJulyDecember
55,669730150
1011,3381,460300
1517,0072,190450

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bilotserkivskyi RaionKyiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.