Solar plant: site data

Solar power plant in Skybyn, Umanskyi Raion, Cherkasy Oblast

Skybyn: 1,129 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.3% below the oblast median (1,144). #152 of 167 in the rayon, #681 of 731 in the oblast.

Uman, the rayon centre, is 61 km away. 213 m above sea level. 50 km away: Lysyanka, the nearest bigger centre, 1,148 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 122 km. 11.19 m between rows, pitch 15.06 m (latitude 49.3°).

Yield of 1 kWp
1,129kWh/year
Tilt
36°3° east of south
10 kW
11,293kWh/year
Row pitch
15.06m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Skybyn

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 122 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan52Feb88Mar118Apr138May143Jun146Jul143Aug115Sep87Oct38Nov29Dec

July: 146 kWh/kWp, December: 29 — 5.0 times less.

January: 32 against 35 in the oblast, 8.6% less.

Skybyn: plants, kWh
kWpA yearJulyDecember
55,647730145
1011,2931,460290
1516,9402,190435

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Umanskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.