Solar plant: site data
Solar power plant in Novosëlki, Vyshhorodskyi Raion, Kyiv Oblast
Novosëlki: 1,097 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 2.2% below the oblast median (1,122). #90 of 169 in the rayon, #975 of 1071 in the oblast.
Vyshhorod, the rayon centre, is 39 km away. 98 m above sea level. 39 km away: Vyshhorod, the nearest bigger centre, 1,112 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Київ, 54 km. 13.32 m between rows, pitch 17.09 m (latitude 50.9°).
- Yield of 1 kWp
- 1,097kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 10,971kWh/year
- Row pitch
- 17.09m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,550 / 370Pa
Ground frame designer
A ground frame for a solar plant: Novosëlki
The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Київ, 54 km: snow 1,550 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 141 kWh/kWp, December: 26 — 5.4 times less.
February: 52 against 56 in the oblast, 7.1% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,486 | 705 | 130 |
| 10 | 10,971 | 1,410 | 260 |
| 15 | 16,457 | 2,115 | 390 |
Example: a 10 kW ground frame
For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.
How these numbers are computed
Nearby
- Sukholuchchia8 km1,075 kWh/kWp
- Tolokun10 km1,063 kWh/kWp
- Rovzhi10 km1,123 kWh/kWp
- Okuninovo12 km1,112 kWh/kWp
- Loshakova Huta13 km1,113 kWh/kWp
- Yasnohorodka14 km1,065 kWh/kWp
All places: Vyshhorodskyi RaionKyiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.